Guide · Svalcon Home

Home battery grants — which consumer unit documents you need

Which consumer unit documents help with a grant application for a home battery and with the acceptance of the installation.

Grant programmes for home batteries in Poland (national and regional) change their terms with every call for applications, so we don’t quote amounts or deadlines here — check them with the programme operator before you buy. Whatever the programme, one thing is always the same: the application and the final settlement require installation documents, and the consumer unit is part of them.

What you usually have to show

  • the installation acceptance report with protective measurements,
  • an installation diagram showing the battery and the inverter,
  • the declaration of conformity for the consumer unit (EN 61439-3) and the device datasheets,
  • an invoice itemising the components (battery, inverter, consumer unit, installation).

What you get with a Svalcon Home consumer unit

Every consumer unit comes with a diagram, a circuit schedule, a routine test report and an EU declaration of conformity — the documents a grant programme requires at acceptance. The serial number on the door leads to the unit’s page, where you can download them again when the grant is settled a year later. The technical documents are issued in Polish.

An order that saves stress

  1. Check the current call for applications and the required documents.
  2. Configure the consumer unit for a battery (battery section + backup power) — configurator.
  3. Order the battery and inverter from your installer; give them the link to your configuration.
  4. Acceptance of the installation with measurements and a complete set of documents.

Work out your consumer unit

Instant price incl. VAT, documentation included.

Open the configurator

Other guides