New house

Consumer unit for a new house — designed for the future

In a new house, the cheapest option is to build the consumer unit once, with spare capacity. Adding solar PV, a battery or a charger a few years later shouldn’t mean replacing the board. Version XL has 72 modules in 6 rows and space for everything.

See ready-made consumer unitsBuild from scratch in the configurator

Sound familiar?

  • The site electrician fitted the “standard”: 12 circuits and no room to expand.
  • Every installer (PV, heat pump, charger) adds their own box next to it.
  • No documentation — when the house is signed off or insured, the test report is missing.

What's in this consumer unit

  • Version XL: 72 modules, 4 RCDs, Type 1+2 SPD, up to 40 circuits.
  • Sections for solar PV, a home battery, an EV charger and a heat pump — straight away or as spare capacity.
  • Smart Ready: power supply and gateway for smart home, so you can add control later.
  • Wiring diagram, circuit chart, test report and EU declaration of conformity for the building sign-off.
Building a house?

From site power to a finished consumer unit

One company for the whole build: first a construction site board, a flush-mounted enclosure before plastering, and finally the complete consumer unit. The rent for the site board comes back as a discount.

  1. Groundworks

    Power on site

    Svalcon: Svalcon Rent construction site board — delivery and connection to the terminal box, test report. From PLN 250.00 net per month, minimum 3 months.

    You: Apply to the network operator for a temporary site supply.

  2. Shell

    Flush-mounted enclosure — stage 1

    Svalcon: Just the back box of the flush-mounted consumer unit (enclosure surcharge from PLN 290.00 net) and a cable entry layout template for the electrician.

    You: The electrician sets the back box and runs the cables according to the design.

  3. Plastering

    Box in the wall, configuration still open

    Svalcon: You can change the equipment up to 14 days before stage 2 — e.g. add an EV charger or a battery storage section; we'll reprice it using the price list from the order date.

    You: We'll remind you by email when it's time to confirm the equipment.

  4. Finishing

    Complete consumer unit — stage 2

    Svalcon: Frame, devices, door, testing and report on your chosen date. 50% of the rent paid for the site board (up to PLN 500.00 net) is deducted in the stage 2 settlement.

    You: Handover of the house with the test report and declaration of conformity. The site board comes back to us.

Staged delivery and flush-mounted enclosure prices are a new offer — we confirm the terms when verifying the order.

Ready-made consumer units for this situation

Most popular

Consumer unit L · Standard

Two-storey house or a house of 150–250 m² — separate circuits for each floor, the garage and the garden — without solar PV or EV charger, replacing an old board with a new one with surge protection.

Version L43 of 48 modulesfits
  • 22 circuits for sockets, lighting and appliances
  • 3 four-pole residual current devices and a T1+T2 surge protection device
  • Wiring diagram, circuit chart, test report and declaration of conformity included
fromPLN 4,046.70incl. VAT · PLN 3,290.00 excl. VAT · excluding delivery
Customise

Energy-efficient house — “everything”

A new house with solar PV, a home battery, a heat pump and an EV charger, controlled by surplus energy — all in one consumer unit.

Version XL70 of 72 modulestight
  • Solar panels: inverter section and a box on the panel side
  • Home battery with whole-house backup power (automatic transfer switch)
  • Heat pump section with contactor and controller supply
  • Electric car charger section, 11 kW
  • Smart Energy — control from solar surplus and tariffs
fromPLN 17,724.30incl. VAT · PLN 14,410.00 excl. VAT · excluding delivery
Customise

Indicative price based on the current price list, excluding delivery; we confirm it after verifying your installation. “Add to basket” adds the consumer unit to your order, “Customise” takes you to the configurator, where you can change every item.

Svalcon Rent

Building? Start with a construction site board

Power on site from day one — and half of the rent comes back as a discount on this consumer unit (up to PLN 500).

See hire options

Frequently asked questions

Who installs the consumer unit on the building site?

Your electrician — they get a finished, tested consumer unit with a circuit chart and wiring diagram, and connect the cables according to the chart. We can also install it ourselves in and around Warsaw.

How many circuits does a 200 m² house need?

Usually 20–28: 2 per room (sockets and lighting), the kitchen separately (4–5), bathrooms, utility room, garage, garden, gate and alarm. It is better to add 3–4 spare ones.

Didn't find an answer? Ask a question using the contact form — we reply within 1 working day.

Other situations